Monday, 15 March 2021
  3 Replies
  124 Visits
0
Votes
Undo
  Subscribe
Jason Schneider would like to bring equipment to Sinawa in April to help grade and trench the main perimeter. We talked about fixing that washout on the north side perimeter trail and trying to grade out a walking path beside the slow speed secrions of the perimeter.

I have a class at Tigerton that weekend but maybe we could make that a work weekend to do the trails, signs, shack, etc?
Ryan Harden
changed the title from Sinawa Work Day May 15th 2021 to Sinawa Work Days April 2021 — 3 weeks ago
3 weeks ago
·
#2569
0
Votes
Undo
What weekend is he thinking?
3 weeks ago
·
#2570
0
Votes
Undo
What type of equipment would he bring? I tried to straighten that part of the trail twice last year and my skid steer almost became a crawling obstacle.
3 weeks ago
·
#2571
0
Votes
Undo
2 weekends in April. PM him directly. Dick, he said tractor and blade.
  • Page :
  • 1
There are no replies made for this post yet.
Be one of the first to reply to this post!